Fire protection provisions and design appraisal check

Enter the building type and size to see which fire protection systems QCVN 10:2025/BCA (in force 30 Dec 2025) requires and whether the fire safety design falls under appraisal per Annex III of Decree 105/2025/ND-CP (replaced by Decree 347/2026/ND-CP, in force 15 Sep 2026).

Updated Technical review: KS. Dương Văn TiếnFree, no sign-up
Quick answer

Hotel, guest house, other accommodation: automatic fire alarm required; automatic suppression not required; fire safety design appraisal to be checked ⚠.

Inputs

m²
Sum of all floors; factories, warehouses: floor area of the largest building
m
From the fire truck road to the sill of the openable window on the top occupied floor

Enter your data, then press Calculate (or Enter).

Preliminary results

Automatic fire alarmRequired
Automatic suppressionNot required
Design appraisalTo be checked ⚠
Sources and assumptions. QCVN 10:2025/BCA (Circular 103/2025/TT-BCA, in force 30 Dec 2025) sections 2.1–2.6, Annex A Table A.1 and notes; design appraisal: Annex III of Decree 105/2025/ND-CP replaced by Annex III of Decree 347/2026/ND-CP (in force 15 Sep 2026), only the factory and warehouse groups checked so far ⚠. For material selection and budgeting only; it does not replace an appraised design. Designs appraised before 30 Dec 2025 may keep the old rules. ⚠ = code table value to be checked against the original standard. Preliminary results for material selection and budgeting; not a substitute for an approved fire protection design.

Systems to provide

SystemResultConditionBasis
Automatic fire alarmRequired≥ 3 storeys or ≥ 700 m² floor · At this size, standalone detectors may replace the automatic fire alarm system.QCVN 10:2025/BCA 2.1, QCVN 10:2025/BCA Bảng A.1 · 18
Automatic suppression (sprinkler, gas…)Not required≥ 5,000 m² floor or fire height ≥ 25 mQCVN 10:2025/BCA 2.5, QCVN 10:2025/BCA Bảng A.1 · 18
Indoor fire hydrantsTo be checked ⚠Per section 2.4 and Annex B (building type, storeys, volume) ⚠ awaiting the Annex B table. Use the Indoor hydrants tool for a first estimate.QCVN 10:2025/BCA 2.4, PL B ⚠
Outdoor fire water supplyTo be checked ⚠Per section 2.3 and Annex C ⚠ awaiting the original table. Exempt when every point of the building is within 400 m horizontally of a hydrant or a public or on-site water source with enough flow (2.3.2).QCVN 10:2025/BCA 2.3, PL C ⚠
Portable extinguishersRequiredAll buildings. Layout per TCVN 7435-1; buildings under construction: at least one ABC powder unit ≥ 4 kg per 500 m² of floor per storey, travel ≤ 25 m (2.6.5).QCVN 10:2025/BCA 2.6
Emergency lighting, exit signsRequiredBy building type and escape routes (section 2.2, TCVN 13456:2022).QCVN 10:2025/BCA 2.2
Fire safety design appraisalTo be checked ⚠Annex III of Decree 347/2026 not yet checked for this building type ⚠. Send us the documents to check.NĐ 105/2025 PL III, thay bởi NĐ 347/2026 ⚠

QCVN 10:2025/BCA Table A.1: automatic alarm and suppression by building type

No.Building typeAlarm required whenSuppression required when
1Detached house with service business (< 30% of floor area)≥ 7 storeysfire height ≥ 30 m
2Detached house with production or flammable goods trade (< 30%)≥ 3 storeys or ≥ 500 m² floorfire height ≥ 30 m
3Apartment building, collective housing, dormitory≥ 5 storeys or ≥ 700 m² floorfire height ≥ 30 m
4Nursery, kindergarten, preschool≥ 300 m² floor or ≥ 100 children≥ 4 storeys and ≥ 5,000 m² floor
5School, other education, social care facility≥ 5 storeys or ≥ 1,500 m² floorfire height ≥ 25 m
6Hospital, maternity, clinic, other health facility≥ 3 storeys or ≥ 300 m² floor≥ 2,000 m² floor or fire height ≥ 25 m
7Nursing homeAny size≥ 500 m² floor
8Sports hall, training hall≥ 500 m² floor or ≥ 200 seatsfire height ≥ 25 m
9Theatre, cinema, circus≥ 500 m² floor or ≥ 200 seatsfire height ≥ 25 m
10Library≥ 300 m² floor≥ 5,000 m² floor or fire height ≥ 25 m
11.1Museum, exhibition – basement, semi-basementAny size≥ 200 m² floor
11.2.1Museum, exhibition – above ground, 1–2 storeys≥ 500 m² floor≥ 1,000 m² floor
11.2.2Museum, exhibition – above ground, 3+ storeysAny size≥ 500 m² floor
12Cultural house, conference centre, multi-purpose hall≥ 3 storeys or ≥ 500 m² floor≥ 5,000 m² floor or fire height ≥ 25 m
13.1Karaoke, nightclub – basement, semi-basementAny sizeAny size
13.2.1Karaoke, nightclub – above ground, 1–2 storeysAny size≥ 500 m² floor
13.2.2Karaoke, nightclub – above ground, 3+ storeysAny sizeAny size
14Religious facility, provincial-level heritage site≥ 4 storeysfire height ≥ 25 m
15.1Market, shopping centre, supermarket – basement, semi-basementAny size≥ 200 m² floor
15.2.1Market, shopping centre, supermarket – above ground, 1–2 storeysAny size≥ 3,500 m² floor
15.2.2Market, shopping centre, supermarket – above ground, 3+ storeysAny sizeAny size
16Restaurant, canteen, aquarium, entertainment, performing arts≥ 500 m² floor≥ 5,000 m² floor or fire height ≥ 25 m
17.1Electronics, general, convenience, flammable goods store – basementAny size≥ 200 m² floor
17.2Electronics, general, convenience, flammable goods store – above ground≥ 3 storeys or ≥ 300 m² floor≥ 3,500 m² floor or fire height ≥ 25 m
17.3Trade in flammable liquids (except in non-combustible packs ≤ 20 L)Any sizeAny size
18Hotel, guest house, other accommodation≥ 3 storeys or ≥ 700 m² floor≥ 5,000 m² floor or fire height ≥ 25 m
19Post office, telecom facility≥ 3 storeys or ≥ 500 m² floor≥ 5,000 m² floor or fire height ≥ 25 m
20Head office, office, research facility≥ 5 storeys or ≥ 500 m² floor≥ 5,000 m² floor or fire height ≥ 25 m
21Mixed-use building, mixed-use apartment≥ 3 storeys or ≥ 500 m² floor≥ 5,000 m² floor or fire height ≥ 25 m
22Airport, railway terminal, port, bus station, rest stop, dry port≥ 500 m² floor≥ 10,000 m² floor or fire height ≥ 25 m
23Air traffic control towerAny sizeAny size
24Inspection workshop, vehicle registration centre≥ 500 m² floorNot required by Table A.1
25.1Enclosed car park – with basement or 2+ storeysAny sizeAny size
25.2.1Enclosed 1-storey car park – resistance I–III, structural class S0Any size≥ 7,000 m² floor
25.2.2Enclosed 1-storey car park – I–III, S1Any size≥ 3,600 m² floor
25.2.3Enclosed 1-storey car park – IV–V, S0Any size≥ 3,600 m² floor
25.2.4Enclosed 1-storey car park – IV–V, S1Any size≥ 2,000 m² floor
25.2.5Enclosed 1-storey car park – IV–V, S2, S3Any size≥ 1,000 m² floor
25.3.1Open car park – every point ≤ 12 m from an open side≥ 4 storeys or ≥ 4,000 m² floorNot required by Table A.1
25.3.2Open car park – some point > 12 m from an open sideAny size≥ 4 storeys or ≥ 4,000 m² floor
26Car repair garageNot required by Table A.1≥ 4 repair bays/floor
27Aircraft hangarAny size≥ 2,800 m² floor
28Road tunnellength ≥ 500 mNot required by Table A.1
29Grain processing and storage building≥ 500 m² floor≥ 3,000 m² floor
30Category C warehouse with racks higher than 5.5 mAny sizeAny size
31Category B, C warehouse with 2+ storeysAny sizeAny size

Frequently asked questions

What does a 4-storey, 1,000 m² hotel need?

Table A.1 row 18: automatic alarm required (≥ 3 storeys); below 5 storeys and 1,500 m² standalone detectors are allowed; suppression not required (fire height < 25 m and < 5,000 m²). Extinguishers, emergency lighting and exit signs are still required.

Does a 2,000 m² category C factory need design appraisal?

Yes. Under Annex III of Decree 347/2026, category C factories are covered from 15,000 m³ volume or 2,000 m² floor area ⚠ check the original.

Which regulation replaced TCVN 2622 and TCVN 3890 for provisions?

From 30 Dec 2025 provisions follow QCVN 10:2025/BCA. TCVN 3890:2023 remains voluntary and the QCVN prevails where they differ; TCVN 2622:1995 is not used for new designs.

Applicable documents

Documents in force at the update date, applied from 1 July 2026. TCVN standards are mandatory only when a QCVN refers to them; where they differ, the QCVN prevails.

CodeTitleEffective fromStatus
Luật 55/2024/QH15Luật Phòng cháy, chữa cháy và cứu nạn, cứu hộ01/07/2025In force
NĐ 105/2025/NĐ-CPChi tiết và biện pháp thi hành Luật PCCC và CNCH01/07/2025In force ⚠
NĐ 347/2026/NĐ-CPSửa đổi NĐ 169/2025, 105/2025, 106/2025, 282/202515/09/2026In force
QCVN 10:2025/BCATrang bị, bố trí phương tiện PCCC và CNCH cho nhà và công trình30/12/2025In force
QCVN 06:2022/BXD + SĐ1:2023An toàn cháy cho nhà và công trình16/01/2023In force ⚠
TCVN 3890:2023Phương tiện PCCC trang bị cho nhà và công trìnhVoluntaryIn force
Luật 135/2025/QH15Luật Xây dựng 202501/07/2026In force
NĐ 217/2026/NĐ-CPQuy định chi tiết Luật Xây dựng về quản lý hoạt động xây dựng01/07/2026In force

See the full list of regulations and standards →