Fire safety advisor for factories, warehouses and buildings
Enter length × width × height or floor area, pick (or type) the business activity and the building structure. The tool infers the fire hazard class and fire resistance, checks design appraisal under Appendix III of Decree 105/2025/ND-CP (replaced by Decree 347/2026/ND-CP) and proposes a solution for each system with rough quantities.
Timber, plywood, pallet warehouse, 2,000 m² floor, 14,000 m³, unprotected pre-engineered steel frame, metal roof: class C, fire resistance IV. Fire design appraisal: required. Automatic fire alarm: verify ⚠. Automatic sprinklers: verify ⚠.
Preliminary results
Volume: 14,000 m³ · Timber, plywood, pallet warehouse · Unprotected pre-engineered steel frame, metal roof
| Criterion | Project | Threshold | Result |
|---|---|---|---|
| Total floor area (m²) | 2,000 | ≥ 2,000 | Met |
| Volume (m³) | 14,000 | ≥ 15,000 | Not met |
Recommended solution
| Item | Verdict | Proposed solution | Basis |
|---|---|---|---|
| Fire safety design appraisal | Required | Meets the threshold of item 10: 2,000 m² floor (threshold 2,000) or 14,000 m³ (threshold 15,000). Prepare the fire design and submit for appraisal before construction: distances, evacuation and compartmentation go with the construction dossier; alarm and suppression go to the police. | NĐ 105/2025 PL III mục 10, NĐ 347/2026 ⚠ |
| Structure, fire resistance Detailed calculation → | Upgrade | Unprotected pre-engineered steel frame, metal roof reaches only about grade IV. For a class C building of this size, fire-protect columns and trusses (R45–R90 per design ⚠) or add fire walls to raise the grade and cut fire water demand. | QCVN 06:2022/BXD Bảng 4, 6 ⚠ |
| Automatic fire alarm Detailed calculation → | Verify ⚠ | Table A.1 of QCVN 10:2025/BCA has no row for a single-storey class C warehouse; it falls under the production and storage part of Appendix A ⚠. Send drawings to Thep Minh Tien to check. | QCVN 10:2025/BCA 2.1, QCVN 10:2025/BCA Phụ lục A ⚠ |
| Automatic fire suppression Detailed calculation → | Verify ⚠ | Table A.1 of QCVN 10:2025/BCA has no row for a single-storey class C warehouse; it falls under the production and storage part of Appendix A ⚠. Send drawings to Thep Minh Tien to check. If required: sprinkler group 3, about 167 heads, 28.8 L/s, water 104 m³ ⚠. | QCVN 10:2025/BCA 2.5, QCVN 10:2025/BCA Phụ lục A ⚠; TCVN 7336:2021 |
| Indoor fire hydrants Detailed calculation → | Required | 2 hydrants × 5.0 L/s, valve and hose DN65, riser DN65, 1-hour water 36 m³ ⚠. | QCVN 10:2025/BCA 2.4; TCVN 3890:2023 ⚠ |
| Outdoor fire water Detailed calculation → | Required | 25 L/s for 3 hours = 270 m³ (Table H.3). Use a public hydrant within 400 m if it has the flow, otherwise a dedicated tank and hydrants, main DN125 ⚠. | QCVN 10:2025/BCA Bảng H.3 ⚠ |
| Fire water tank, pump station Detailed calculation → | Estimate | Total fire water ≈ 410 m³ (sprinklers + indoor + outdoor hydrants). Pump station: main electric pump, standby diesel pump, jockey pump ⚠. | TCVN 7336:2021; QCVN 02:2020/BCA |
| Portable extinguishers Detailed calculation → | Required | 20 extinguishers rated 4A (≤ 100 m² each, travel ≤ 15 m), at least 2 per floor; add CO₂ units at electrical panels. | QCVN 10:2025/BCA 2.6; TCVN 7435-1:2004 |
| Emergency lighting, evacuation | Required | Emergency lighting and exit signs at exits and corridors; provide enough exits per QCVN 06:2022/BXD ⚠. | QCVN 10:2025/BCA 2.2; QCVN 06:2022/BXD |
| Acceptance, records Detailed calculation → | Required | The owner carries out acceptance and keeps as-built records; police post-inspect. Managed facilities need a firefighting plan, an in-house fire team and training. | NĐ 105/2025 Điều 8; NĐ 347/2026 ⚠ |
Who appraises, who accepts
| Task | By | Basis |
|---|---|---|
| Appraisal of fire separation distances, fire truck access, evacuation, fire resistance, compartmentation, smoke protection | The construction authority, together with the construction design dossier. Projects outside its remit are self-appraised by the owner. | Law 55/2024/QH15; Decree 105/2025 Art. 8, 9; Law 135/2025/QH15 ⚠ |
| Appraisal of fire alarm, fire fighting systems and fire-service power | Police: the Fire Police Department or provincial police according to delegation. | Decree 105/2025 Art. 9; Circular 36/2025/TT-BCA ⚠ |
| Acceptance | The owner organises acceptance, signs the record and is responsible. Police inspection of acceptance results has been abolished in favour of post-inspection. | Decree 105/2025 Art. 8; Decree 347/2026 repeals Art. 10 ⚠ |
| Projects not listed | No appraisal certificate needed, but design, construction and equipment must still meet the regulations. Facilities in Appendix I of Decree 105/2025 remain subject to periodic fire inspections. | QCVN 06:2022/BXD; QCVN 10:2025/BCA; Decree 105/2025 Appendix I |
Appendix III: buildings requiring fire safety design appraisal
| Item | Building type | Required when |
|---|---|---|
| 1 | Apartment buildings, collective housing | ≥ 7 storeys or ≥ 3,000 m² floor |
| 2 | Nurseries, kindergartens | ≥ 2,000 m² floor or ≥ 150 children |
| 2 | Schools, universities, colleges, vocational and research facilities | ≥ 5 storeys or ≥ 3,000 m² floor |
| 3 | Hospitals | Any size |
| 3 | Clinics, health stations, maternity homes, nursing homes, other healthcare | ≥ 5 storeys or ≥ 2,000 m² floor |
| 4 | Stadiums | ≥ 5,000 seats |
| 4 | Sports halls, training halls | ≥ 5,000 m² floor or ≥ 5,000 seats |
| 5 | Theatres, cinemas, circuses | ≥ 300 seats |
| 5 | Convention centres, cultural houses, museums, libraries, exhibitions | ≥ 5 storeys or ≥ 3,000 m² floor |
| 5 | Dance clubs, karaoke, entertainment venues | ≥ 4 storeys or ≥ 1,000 m² floor |
| 6 | Markets, shopping centres, supermarkets, shops selling flammable goods | ≥ 2,000 m² floor |
| 6 | Restaurants, eateries | ≥ 3,000 m² floor |
| 7 | Hotels, guest houses, accommodation | ≥ 7 storeys or ≥ 3,000 m² floor |
| 7 | Post offices | ≥ 7 storeys or ≥ 3,000 m² floor |
| 7 | Head offices, office buildings | ≥ 7 storeys or ≥ 3,000 m² floor |
| 8 | Multi-purpose, mixed-use buildings (with parts under items 1–7) | ≥ 7 storeys or ≥ 3,000 m² floor |
| 9.1 | Refineries, petrochemical, gas processing; fuel and LPG depots; filling stations with 1+ pump | Any size |
| 9.2 | Power plants; substations 110 kV and above | Any size |
| 9.3 | Explosives production and storage, precursors, weapons, support tools | Any size |
| 9.4 | Production buildings, class A, B | ≥ 1,000 m² floor or ≥ 7,000 m³ |
| 9.4 | Production buildings, class C | ≥ 2,000 m² floor or ≥ 15,000 m³ |
| 9.4 | Production buildings, class D, E | ≥ 10,000 m² floor or ≥ 30,000 m³ |
| 10 | Warehouses, class A, B, C (timber, paper, textiles, plastics, goods in combustible packaging) | ≥ 2,000 m² floor or ≥ 15,000 m³ |
| 10 | Warehouses, class D, E (steel, metals, non-combustible goods without combustible packaging) | Not listed |
| 11 | Technical infrastructure of urban areas, housing estates, industrial parks and clusters, tourist zones | Check dossier, construction grade ⚠ |
| 12 | Enclosed car and motorbike parking, enclosed vehicle showrooms | ≥ 2,000 m² floor |
| 13 | Airport terminals, aircraft maintenance buildings, control towers | Any size |
| 13 | Inland waterway ports and wharves, seaports | Check dossier, construction grade ⚠ |
| 13 | Bus stations, vehicle inspection centres, rest stops, vehicle repair buildings | ≥ 3,000 m² floor |
| 13 | Railway stations, depots, cable car stations | ≥ 3,000 m² floor |
| 14 | Road, rail and metro tunnels | length ≥ 1,000 m |
| 15 | Buildings of nuclear facilities | Any size |
- Total floor area is taken for the largest building in the project.
- If a project has a listed building, its other items with fire requirements must also be appraised.
- Applies to new construction, renovation and change of use affecting fire safety conditions.
- Construction grade is determined under construction law.
Frequently asked questions
Does a 2,000 m², 7 m high timber warehouse need fire design appraisal?
Yes. A timber warehouse is class C. Item 10 of Appendix III: class A, B, C warehouses from 15,000 m³ or from 2,000 m² floor area. The volume of about 14,000 m³ is below the limit, but 2,000 m² reaches the area threshold.
Does a large steel warehouse need appraisal?
Warehouses of bare steel and metals without combustible packaging are usually class D or E, not covered by item 10, so not listed regardless of size ⚠. Areas holding plastic pipe, timber or goods in paper or plastic packaging may become class C.
If not listed, is anything required?
Yes. No appraisal certificate, but design, construction and equipment must comply with QCVN 06:2022/BXD and QCVN 10:2025/BCA (see the Required fire equipment tool), and inspections still apply to facilities under fire management.
Who carries out acceptance from 01/07/2026?
The owner organises acceptance and is responsible. Police inspection of acceptance results was abolished in favour of post-inspection ⚠.
Applicable documents
Documents in force at the update date, applied from 1 July 2026. TCVN standards are mandatory only when a QCVN refers to them; where they differ, the QCVN prevails.
| Code | Title | Effective from | Status |
|---|---|---|---|
| Luật 55/2024/QH15 | Luật Phòng cháy, chữa cháy và cứu nạn, cứu hộ | 01/07/2025 | In force |
| NĐ 105/2025/NĐ-CP | Chi tiết và biện pháp thi hành Luật PCCC và CNCH | 01/07/2025 | In force ⚠ |
| NĐ 347/2026/NĐ-CP | Sửa đổi NĐ 169/2025, 105/2025, 106/2025, 282/2025 | 15/09/2026 | In force |
| QCVN 10:2025/BCA | Trang bị, bố trí phương tiện PCCC và CNCH cho nhà và công trình | 30/12/2025 | In force |
| QCVN 06:2022/BXD + SĐ1:2023 | An toàn cháy cho nhà và công trình | 16/01/2023 | In force ⚠ |
| Luật 135/2025/QH15 | Luật Xây dựng 2025 | 01/07/2026 | In force |
| NĐ 217/2026/NĐ-CP | Quy định chi tiết Luật Xây dựng về quản lý hoạt động xây dựng | 01/07/2026 | In force |